02 / Petroleum terminals

Understand the transfer.
Explain the difference.

Operating history, comparisons and service context for shore-side equipment.

Connect suitable measurements through an onsite gateway. Give operators and technicians local and remote views of the transfer, the equipment and the events around a change.

Discuss your terminal

Define the boundary first

A shared transfer.
Clear responsibility.

For tanker-ship unloading, vessel and shore equipment can have different owners, measurements and control responsibilities. A useful assessment begins by agreeing exactly what is in scope.

Shore-side equipment
Identify the applicable pumps, motors, bearings, lubricators and transfer path.
Available measurements
Review suitable runtime, flow, pressure, energy and condition information within that boundary.
Maintenance ownership
Connect each exception with the team authorized to inspect, refill, repair and verify the work.

Illustrative dashboard

Put a transfer
in context.

An example of how transfer information and equipment condition could support investigation. It represents a concept, not a connected terminal.

Terminal dashboard conceptSynthetic example
Detail view · swipe to explore
Illustrative terminal condition and maintenance dashboard, showing equipment measures, service review and unresolved verification
Illustrative interface with synthetic readings. No live equipment connection or equipment commands. Measurements apply only to the defined shore-side equipment and transfer boundary.

Normal operations deserve a clear report

Two similar transfers.
Different elapsed time.

Compare the product, route and receiving conditions before deciding what a difference means.

Where measurements support it, a configured report can separate elapsed time from running time, show interruption duration and cause, and compare running throughput or energy for the metered equipment. Keep equipment trips separate from planned pauses, receiving constraints and ship/shore coordination delays. A longer transfer is a question to investigate, not automatic evidence of a failed pump.

For a service visit, bring the earlier trend, equipment records and previous finding into view, then review what changed afterward.

A useful maintenance record

See the exception.
Follow the response.

  • Place supported lubrication faults beside the operating history.
  • Keep an unresolved issue visible across a shift handoff.
  • Record the inspection, refill or repair and who completed it.
  • Compare before-and-after condition under comparable duty.

Available feedback determines what can be verified. Missing data remains a gap to investigate.

Potential performance evaluation

Understand interruptions.
Then evaluate improvement.

Transfer history may reveal questions worth testing about interruptions or energy per barrel.

A separate evaluation first establishes pump curves, operating limits, measurement boundaries and control authority. Any trial requires site-engineer approval. Shore-side measurements do not describe the entire ship-to-shore system.

No throughput increase, energy saving or automatic transfer-pump control is promised.

A practical first step

Define one shore-side scope.

Bring the equipment list, operating responsibility and a maintenance question from a recent transfer.

Illustrative dashboard